Tuesday, 28 Mar 2017
Nano-Crete Cool Pavement

ROBERT DUFFY SCHOOL

PHOENIX 2011

 

The owner requested we tape off the white striping as the parking lot was new.

 

Typically it is less expensive to just re-strip following the Cool Pavement coating.

 

 

A 5 gallon pail of EC Nano Solution is mixed with one 80 lb bag of EC Silica Cement and premeasured color.

 

Mixing for 3 minutes, followed by a 1 minute "false set" yeilds a creamy texture perfect for the Graco texture sprayer.

 

 

Workmen move in tandum delivering the pails of liquid nano-crete™  to the Graco texture spray hopper,

 

Timing is important, as the spray operation typically moves faster than blending.

 


 

The first coat is a primier to cover the black. EC "Cool Slurry" can now be used in place of this spray coat.

 

The second coat is the finishing coat followed by with the sealer.

 

 

 

 

 

Can be driven on the same day following the application of the sealer coat.

 

Curing occurs upon hydration, and  for 28 days.



CITY OF PHOENIX

SHERATON DOWNTOWN PARKING LOT - JUNE 2011